What to Know About Land Clearing: Costs, Timeline and More
August 13, 2020 5:16 pm Leave your thoughtsSite preparation is a crucial part of the construction process. To find success with your construction, you must make sure the land at the site is fully prepared for work, whether that means clearing the land of trees and debris, excavating an area or properly grading the land for level or slope.
Land clearing projects in Jeffersonville, IN to remove rocks and vegetation are generally the first step, which is important because lots of vegetation (particularly trees and shrubs) can be significant nuisances during the building process if not properly removed. Tree roots, for example, might be located entirely underground, but they can become hugely problematic if left unaddressed, potentially interfering with underground utilities.
Here’s an overview of what you should know about this early step in the process of site preparation.
Costs
As with any site preparation and construction process, you can expect costs to vary based on the location and size of the site and the amount of work that needs to be done to prepare it. But in general, homeowners can expect to spend about $2,795 on average for land clearing, or anywhere between $1,200 and $4,400 to get the land sufficiently clear to build the house. Keep in mind that’s just the average price range—costs can be significantly lower or higher depending on square footage and the amount of work to be done.
Removing trees is a very necessary process, and also one that will likely contribute to the overall expense you can expect to fork out. You can expect to pay an average of $650 for a single tree, and less for trees that have already fallen. If there are numerous trees on the property, you’ll generally be able to get a better per-tree rate.
Brush removal isn’t quite as difficult as tree removal, so you won’t have to pay quite as much. Average costs generally fall between $20 and $200 per acre, depending on the area and the level of growth.
Finally, you’ll need to consider hourly labor and the costs of land clearing equipment, which will also add to what you can expect to pay for the land clearing process.
Timeline
It’s difficult to give an average timeline for a land clearing project, because there are so many factors that go into the amount of time it will take. In general, you can assume that lots that are larger and/or have more trees, shrubs or rocks will take more time to clear than smaller lots with fewer trees and obstacles to remove.
While the process will typically not take as long as some other important site preparation tasks, it’s important that you do not allow professionals to rush through it. Proper land clearing is one of the first tasks you can perform that will set your construction project up for long-term success, so it’s important to be thorough and do it right the first time around.
For more information about land clearing projects and the average cost of land clearing in Jeffersonville, IN, contact Estes Excavating Inc. today. We take pride in leaving worksites better than they were upon our arrival, and debris removal is a big part of that. We look forward to working with you soon!
Categorised in: Land Clearing
This post was written by Writer